Fridge Status :
Pump vacuum pressure in 1.6e-4 mbar so came in during weekend to add the pump station turbo as well.
Raised Main Bath yesterday. Thanks Myles to help with that along with doing the final cryocleaning.
LN2 transfer will be today. Preparation for the same going on.
Mike said we have enough LHe for tomorrow.
Lab Safety:
Inspection done yesterday.
Flammables (Methanol, Iso, for cleaning) need to be stored in a storage. Vuk suggested fume hood?
Ladder used in the lab donot have any safety stickers and hence cant be used. Where to get those?
Signs need to be updated. Lab safety officer will send me a template.