UMN CDMS Wiki archive
start › cdms › k100 › group_meetings › 20241029
Teleconference link: https://umn.zoom.us/j/9024497080?omn=98454621599
Meeting ID: 902 449 7080
Domestic: 1-408-638-0968 (US toll)
Access code:
  • Lab Update - Run 82 preparation
    • Status : Fridge is warm.
    • Indium solder will arrive in PAN today.
    • Plan is to remove old solder and redo the endstop pins on the tower.
    • Next will be lowering the tower to access the source mover to initialize to zero after making moves.
    • Cryocleaning on going. Luke and Myles will get trained for that today after group meeting.
    • Pump parts that arrive didnt fit the Leybold turbo. I borrowed a few parts from parts lying in High Bay to test the turbo pump.
    • DAQ:
      • Waiting for components to arrive.
      • No other update.
    • Accelerometers:
      • Mounting options:
        • For single-axis piezos, the only option is adhesive: https://www.pcb.com/products?m=352c22
          • Loctite or double sided tape.
        • For tri-axial piezo: two options are available i.e. adhesive and stud-type mounting. To be decided.
      • Survey at SNOLAB to be done during the first cool-down when all sources of vibration e.g. 50K cryo-coolers and PT are on.
      • For frequency response analysis: we need to acquire data using a dedicated DAQ or advanced scope.
        • The current scope in the lab is quite outdated.
  • Priority Updates
  • General Updates
    • Himangshu
    • Shubham
    • Zach
    • Elliott
    • Jacob
  • Fun Update