- Lab Update - Run 81 ending
- Status : Fridge is warming up. It took way longer than normal to warm the fridge this time.
- Almost reached the dew point. Will lower the main bath today.
- Took out needle-valve… ordered new o-rings.
- Himangshu has been working towards re-routing 1K pot thermometry cables from old IGH to LakeShore bridge.
- Working towards new DAQ system.
- Channel mapping is fully worked out.
- Pin Mapping at the adaptor: link
- Confirmed by performing continuity test with DMM.
- We can use HV box, and apply HV to one side of detector.
- Checking DCRC calibration… whether applied bias value appears on the pins or not…
- calibration file for SN8 is available.
- Power-cycling the DCRC seems to reset the ODB parameters.
- After setting everything to zero:
- After power-cycling the DCRC
- Values across RevC Minibob doesn't make sense. QET_A/GND = -1mV, QET_B/GND = 628mV, QET_C/GND = -4 mV, QET_D/GND = 0 mV, No change if we change the valves in ODB.
- Removed Minibob and tried connecting 2K ohm resistor across QET_A/GND pins on the adaptor, voltage reads = 86 mV (corresponds to 43 uA down the line). No change if we change values in ODB.
- NaI trigger integration: Anthony says he will also have to update to the new DCRC. Wants us to send other ReE DCRC to Denver to work on firmware development.
- Priority Updates
- General Updates
- Himangshu
- Shubham
- Zach
- Elliott
- Jacob
- Fun Update