  • Lab Update - Run 81 started
    • Unable to reach base temperature after multiple tries:
      • Still does not go below 1 K
      • MC does not go below 0.9 K
    • Probable reasons:
      • 1K pot : Not cooling returning He3 effectively. We have also observed that we have a slight higher pressure (> 40 mbar) in 1K pot even by opening needle valve by a tiny amount (nominal < 20 mbar).
      • Incorrect mix amount in the lines : Documents say if still heats up sharply after applying the heater means still is running dry BUT it also says not to increase condenser pressure by > 200 mbar to avoid overloading 1K pot. I haven't found any documentation after the change of GHS. Working on previous numbers and documentations.
      • Clogged traps? : LN2 traps havent been cleaned since the start of the run AFAIK. However G1 and G2 pressures doesn't seem to go haywire.
      • Not optimal circulation of the mix : Don't know if the throughput was done.
      • Not good vacuum in the IVC : Turbo may not pumping out effectively.
    • Reached out to Prof Paul. He suspects needle-valve might have ice formed around it therefore it is not acting as “needle-valve”. We might have to warm up to 77 K.
  • Priority Updates
  • General Updates
    • Himangshu
    • Shubham
    • Zach
    • Elliott
    • Jacob
  • Fun Update