| Teleconference link: | https://umn.zoom.us/j/9024497080?omn=98454621599 |
| Meeting ID: | 902 449 7080 |
| Domestic: | 1-408-638-0968 (US toll) |
| Access code: |
- Lab Update - Run 81 started
- Restarting circulation shows issues at base temperature.
- Not sure if the wobbly VT valve is causing the fluctuations.
- Warmed up to 4K again to look for a solution.
- Few observations:
- Cleaning mixture show high contaminants levels (~100 mbar)
- After reaching 1K using V2 valve. there is temperature fluctuations which start a downward trend when we open the VT valve further. It gets very loosened at this point.
- Priority Updates
- General Updates
- Himangshu
- SNOLAB Monitoring meetings at Thu 12-1 pm.
- We discussed that current scripts and mysql database will be transferred to iPC which will be used as we move forward.
- Earlier this was done using cdms-work computer
- This transfer was done last Tuesday.
- Shubham
- Zach
- Elliott
- Jacob
- Fun Update
