Paul found a manual gas handling system in storage from Greven's Lab.
Paul helped me get that to our lab yesterday.
We assessed the changes that need to be made to be able to use this setup with our current hoses and pumps.
-
-
Most changes are adapters for NW10 to NW16. There is one coldtrap in this system and we plan to make a T at the coldtrap line to split it for two coldtraps in our case.
-
-
The first step will be switching over this dump to our dump. We are guessing the pressure on the line to be below 1 atm and hope to lose a minimum mixture while switching the line.
Major step will be the last step of switching the He3 pump return line where we have a good volume of mixture left and Paul discussed with me how to do that step.