UMN CDMS Wiki archive
start › cdms › k100 › group_meetings › 20240618
Teleconference link: https://umn.zoom.us/j/9024497080?omn=97566406773
Meeting ID: 902 449 7080
Domestic: 1-408-638-0968 (US toll)
Access code:
  • Lab Update - Run 80 ended
    • IGH issue not yet solved. Three possible scenarios explored.
    • Cryocleaning steps shows the original IDR is not in a stable state.
    • Scenario 1: Using the original IDR unit with caution and workaround steps. This will be clear by end of this week.
    • Scenario 2: Using Goldman's lab IDR to control solenoid valves. The stepper valves, V6 and V12a needs to be replaced with manually controllable switches. G1 and G2 gauge needs to be calibrated.
    • Note: Goldman's lab IDR is not responding to power after few retries. Possible fuse replaced but still didnt work.
    • Scenario 3: If Scenario 2 donot work for any reason, we will use brute force manual switches to change solenoid valve states and use the stepper valves just as in Scenario 2. I am currently mapping the solenoid valve wiring. Original IDR can be kept in test mode to use G1/G2 gauge calibrations.
    • I will be removing V6 stepper motor today.
    • Shall we go with the consultation before removing the wire plugs completely?
  • Priority Updates
  • General Updates
    • Himangshu
    • Shubham
    • Zach
    • Elliott
  • Fun Update