Fridge Status : Fridge is at 4K to clear out partial plug on the still line.
Temperatures were trending upwards after the partial plug, which is evident with a high return pressure and very low still pressure.
Prof. Paul suggested to install a baratron on the mix dump since he doubts the pressure reading on the G2 gauge. We found one of the basement alley. I got a power source and he found the molex connector, so we will install it today before adding pure He3 to tune the mixture.
Setup for adding pure He3 is ready.
-
We will add He3 after installing the baratron on the dump line.