| Teleconference link: | https://umn.zoom.us/j/2461438631 |
| Domestic: | 1-646-558-8656 (US toll) |
| Domestic: | 1-408-638-0968 (US toll) |
| Access code: | 908-227-5310 |
- Lab Update - Run 77
- Cleaned o-rings on needle valve with methanol and install it back into the fridge with some vacuum grease.
- Installed 100 mK, 30 mK and the middle IVC section.
- Next step will be to install the tower.
- Still not clear about the 1D source mover installation steps. Found some documentation on how to run the source mover with Arduino in this link. But not clear mapping of the channels in Run 73.
- Source inventory check yesterday. We found that keys used to lock the PuBe source was missing and lock was open. Later, Matt confirmed that the keys are missing. Need to order new locks.
- Priority Updates
- General Updates
- Himangshu
- Fridge Monitoring status page is getting updated with PTcompressor variables. Local testing is fine, but having some issues with updating the main page. Still working on this.
- Shubham
- Jack
- Derek
- Zach
- Backing array update slides
- Scott
- Giulia
- Fun Update