UMN CDMS Wiki archive
start › cdms › k100 › group_meetings › 20230126
Teleconference link: https://umn.zoom.us/my/will5092
Domestic: 1-646-558-8656 (US toll)
Domestic: 1-408-638-0968 (US toll)
Access code: 908-227-5310
  • Lab Update - Run 77 preparation
    • Added copper tape to cover the holes/gaps on top of the tower, then installed the tower and all the thermal stages into the fridge.

  • We decided on using SQUET ZC-31+interposer, ZC-74, ZC-26 on Stripline 41, 48, 43 respectrively. Tower Faces ( 5, 3, 2, (6 acc)) remains same as last run.
  • All three SQUETS at the bench have working SQUIDS, feedback coil and QETS.
  • One of the squets (ZC-74) is not forming a good connection with the stripline, can't get all channels to connect at the same time. Tried cleaning the pins, now trying to use an interposer board to bridge them. We are using an old interposer board and replacing missing pins to complete all connections to the stripline.

  • Priority Updates
  • General Updates
    • Himangshu
    • Shubham
      • k100sim: Effect of blast-sand on trigger rate: slides
    • Jack
      • Slides from Cosmo Seminar
    • Derek
    • Zach
    • Scott
    • Giulia
  • Fun Update