Soldered connectors for tower to ends of 2D source mover striplines.
Tested 2D source mover upside-down
Make connector to plug Goldman thermometer into fridge thermometer wires
Plan out stack arrangement. The 0-direction of the source mover is aligned with DIB1 which is the -y direction on the detector
Assemble tower, tie down wires. Tower electrical check looks good.
Today: preparing accessory wiring (cold-side interposer and warm-side diverter). Connections for source mover motors and piezo motion sensor.
Today: install tower. During tower installation we plan to test the source mover.
Hope to start cooling Monday (need to start cryocleaning mixture)
-