UMN CDMS Wiki archive
start › cdms › k100 › group_meetings › 20220131
Teleconference link: https://umn.zoom.us/my/fritts
Domestic: 1-646-558-8656 (US toll)
Domestic: 1-408-638-0968 (US toll)
Access code: 908-227-5310
  • Lab Update:
    • Realized that the non-functional channel, Side1pF, was a difficult wirebond repair - had to do surgery to turn a QET into a hopscotch pad.
    • Checked out the Side1-readout HV board: we reloaded a lot of resistors for biasing Side2 but two of them need to be redone. Otherwise ready to try.
    • Checked out the Side2-readout HV board: this one has never been tested. Looks like there may be errors in 4 connections.
      • The Side2-readout board may not work as well - several channels cross ground planes (in the Side1-readout board only one does this)
      • If we can't repair Side1pF, we should be able to rewire the Tower so that we can use the Side1-readout board to read out detector side 2
  • Priority Updates
  • General Updates
    • Himangshu
    • Shubham
    • Jack
      • Progress on LF noise
      • Have rough LF template - look at prepulse region and define relative phase to the template
    • Derek
    • Zach
    • Michael
    • Scott
    • Giulia
    • Giovanna
    • Pramod
  • Fun Update