| Teleconference link: | https://fnal.zoom.us/j/9082275310 |
| Domestic: | 1-646-558-8656 (US toll) |
| Domestic: | 1-408-638-0968 (US toll) |
| Access code: | 908-227-5310 |
- Lab Update
- More cryo drama. After partial warmup to remove helium from IVC, can't cool below 4K. Probably due to two procedural errors:
- Left the DCRCs on during initial LHe transfer and overnight after that. That warmed the base to >10 K overnight - surprising. Took a couple days to figure out that was the problem. Couldn't get the 1K Pot to cool it.
- Left 1K Pot open to Main Bath during partial warmup. Now 1K Pot doesn't work, must have ice in it.
- Warming up again to fix 1K Pot
- piZIP concept (Matt). Matt Pyle's piZIP presentation
- General Updates